Scaffolding Material

scaffolding material
Wooden Board size : 1.0m. | 1.2m. | 1.5m. | 2.0m. | 2.5m. | 3.0m. | 4.0m.
Aluminum Board size : 1.0m. | 1.5m. | 2.0m. | 3.0m. | 4.0m.
Double Clamp
Single Clamp
Sleeve Clamp
Swiwvel Clamp
Beam Clamp
Base Plate
Ladder size : 1.0m. | 2.0m. | 2.5m. | 3.0m. | 4.0m. | 5.0m. | 6.0m.
Ladder Beam size : 2.0m. | 3.0m. | 4.0m. | 6.0m.
Scaffolding Tube size : 0.5m. | 1.0m. | 1.5m. | 2.0m. | 3.0m. | 3.5m. | 4.0m | 5.0m.
Lever Hoist
Snatch Block
Round Sling

MAINTENANCE

Apart for IE Construction and Installation services that we are providing. We are trusted in our installation, Platform Preventive maintenance, Sub Coordinate to services of Gas pipeline inspection. (PIG Launcher & PIG Receiver), Booster Compressor Gas turbine, Alignment & Balancing, Vibration Analyzer.

Image credit: G. cialis drug Flibanserin only to be prescribed by certified health care professionals, pharmacies.