CONTRACTOR's experience and reference for similar Well E&I Work
Item GroupCES Project No. Description Client Location Service Order No. Year
Project 2009 (E&I Work)
1 910P/09 TBA 08-15 six cable pulling work and cable tray installation inside turbine (3 generator turbine ) PTTEP 2009
2 868P/09 WRA 09-040 Pulling Cable 4 Cables at APP PTTEP 2009
3 801P/09 Lay Fiber Optic Cable at Control Room and Technical Room, Bongkot Field PTTEP 2009
Project 2010 (E&I Work)
4 1094P/10 TAA-08-092 3rd Produced water injection pump PTTEP 2010
5 1050P/10 Bongkot Fiber Optic and Hotspare room relocation campaign PTTEP 2010
6 1045P/10 TBA 07-32 Installation of H2S online analyzer for 2 out of 3 voting system PTTEP 2010
7 1009P/10 TAA 08-092 Temporary Water Injection Pump Offshore E&I Installation Scope of Work PTTEP 2010
8 973P/10 H2S analyzer support sturcture fabrication and Installation PTTEP 2010
Project 2011 (E&I Work)
9 1284P/11 DAA 11-017 Condensate Metering Upgrade (Phase 1, Flow Computer Installation) PTTEP 2011
10 227P/11 ELG-11-0347 Pipe Handling and Test Bay Equipment for New EWE Workshop PTTEP 2011
11 1219P/11 MOD 10-014 To provide flow control system for Regen gas coolers - AGR System CPOC 2011
12 1204P/11 DBS-11-03 To Installation of Telecommunication link system between GBN - GBS PTTEP 2011
13 1098P/11 DAA 10-026 Instrument demolition and installation works PTTEP 2011
Project 2012 (E&I Work)
14 180P/12 DBA 11-09 Install second limit switch detecting opening position for WP23 to 25 PTTEP 2012
15 175P/12 Cable installation from JBAN-MLQB-201 to PCU-5000 PTTEP 2012
16 174P/12 MOD-006 Ultrasonic Flowmeter Installation on FSO CPOC 2012
17 114P/12 MOD 11-029 Relocation of Instruments located between water injection pump P-0160B&C CPOC 2012
18 016P/12 TBA 06-21 Bongkot Fire & Gas Upgrading Project PTTEP 2012
Project 2013 (E&I Work)
19 005LP/13 DBA 11-35 To Change Pressure Recorder to Pressure Transmitter on WP1 PTTEP 2013
20 004LP/13 DBA 11-17 To Replace FR-9112A-B and FR-9132A-B PTTEP 2013